Pre-Construction Anti Termite

Soil-stage termite protection for new homes, buildings and commercial projects before flooring and finishing work begins.

Pre-construction anti termite treatment protects the building at the stage when the soil, foundation trenches, plinth and floor beds are still accessible. This is the best time to build a defensive barrier because treatment can reach the termite entry zones that become hidden after construction is complete.

Best for

Planned protection and high-risk sites

This service is designed for properties where access, compliance, construction stage or operational hygiene needs a more structured pest control plan.

Method

Survey-led execution

We inspect first, choose the right application method, coordinate site readiness and explain what needs to be maintained after service.

Where protection is applied

  • Foundation trenches, column pits and wall-floor junctions before concrete is placed.
  • Plinth filling, internal floor beds and expansion joints before final flooring.
  • Service pipe entries, conduits and utility penetrations that can become termite routes.
  • External soil along foundations, garden edges and future moisture-prone zones.

Our treatment approach

  1. 01

    Review construction stage, drawings and accessible soil zones before treatment.

  2. 02

    Treat foundation, plinth and floor-bed soil with site-suitable termiticide application.

  3. 03

    Coordinate with civil teams so treatment is not disturbed before concrete or flooring work.

  4. 04

    Document treated zones and advise protection for future drilling, plumbing or landscaping changes.

Before our team arrives

  • Inform us before foundation backfilling, plinth filling or flooring starts.
  • Keep treated areas accessible and free from construction debris.
  • Share site drawings, stage photos or engineer notes where available.
  • Avoid waterlogging and soil disturbance immediately after treatment.

After service care

  • Do not excavate treated soil unless the area is re-treated.
  • Seal pipe gaps and service entries during finishing work.
  • Keep wood, shuttering scrap and cardboard away from foundation edges.
  • Plan inspection after major plumbing, renovation or landscaping changes.
Why it works

Advanced service needs planning, access control and clear handover.

We keep the service practical: inspect the site, treat the right zones, explain operational precautions and leave the customer with concrete prevention steps.

When should pre-construction treatment be done?

It is best done during foundation, plinth and floor-bed stages before treated soil is covered.

Can this be done after flooring?

After flooring, the method changes to post-construction treatment because soil access is limited.

Does construction activity affect treatment?

Yes. Treated zones should not be dug up, diluted or disturbed before covering work is complete.